0.0003″ tolerance
Held across 11,400 connectors — last audit cycle


Drag to compare · Strip, plate, coat, cure
Proof before prose
The numbers your
QA team will print out.

Process Control
XRF thickness verification — every lot, every layer

Statistical Process Control
ISO Class 7 clean room — no airborne contamination tolerance

Cycle Time
Continuous-flow line — no batch queuing delays

Compliance
Zero surveillance findings — last three NADCAP cycles
Client Outcomes
What staying with the
wrong vendor costs.
Rejection rate — 14,200 connectors over 6 months
The Situation
Previous vendor delivered 3 consecutive lots with gold thickness outside AMS 2422 spec on gold-finger connectors. Program hold triggered. Requalification audit scheduled in 11 days.
Substrate Result
Full first-article documentation delivered in 72 hours. Requalification audit passed without findings. Program back on schedule within two weeks of first lot delivery.
Qualification-to-delivery, including full IPC documentation
The Situation
EMS partner flagged tin whisker risk on RF shielding panels 60 days before 510(k) submission. Needed full conversion to matte tin + barrier nickel, with IPC-4552 documentation, without slipping the FDA window.
Substrate Result
510(k) submission met on original date. FDA reviewer cited complete finish traceability package as exemplary documentation. Zero resubmission cycles.
Average turnaround — 23 consecutive lots
The Situation
Current plater averaging 12-day turnaround on selective gold plating. Contract delivery windows required 5 days. Three programs simultaneously at risk of T&M penalties.
Substrate Result
All three programs delivered within contract windows. Penalty exposure eliminated. Now primary plating source for six additional platforms at the same OEM.
Ready to stop requalifying?
Tell us your substrate and finish.
We'll tell you exactly what we can hold.
Compliance Framework
11 active certifications.
Zero surveillance findings.
All certifications maintained with zero lapse since 2019. NADCAP audit reports, AS9100D quality manual, and first-article documentation packages available on request for vendor qualification packages.